“Ultimate quality control” is always commitment of SupAnchor. Responding to this commitment, SupAnchor Quality Management Upgrading Project (QMUP) was initiated since October 2015.
First, upgrade on quality management procedure.
Second, upgrade on training session on sense of quality, safety, machine operation and maintenance (minimum 4 hours per month).
Third, upgrade on internal communication (quality issue must be solved in the day).
The target of QMUP is to upgrade sense of quality of each SupStaff and motivate their implementation. It’s always SupAnchor’s commitment to serve with 100% safe anchoring products for each customer.

An industry report on SupAnchor's innovative geotechnical reinforcement systems stabilizing complex rock formations in a new transportation tunnel, emphasizing technical specs and global trends.
SupAnchor's SupHulk friction rock bolt system provides immediate load bearing, high adaptability, and reliable support for challenging geotechnical conditions in mining and tunneling projects.
SupAnchor's self drilling anchor system provides critical geotechnical reinforcement in challenging tunneling projects, showcasing innovation and reliability for global infrastructure needs.
SupAnchor introduces GFRP reinforcement rebar, offering high corrosion resistance and tensile strength for applications in bridges, sea walls, and industrial projects.
An in-depth industry report on how SupAnchor's self drilling anchor bolts solved complex geological challenges in a tunneling project, with technical insights and global trends.