The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

Exploring how SupAnchor's self drilling anchor bolt system addresses complex geological challenges in a major European tunnel project, with insights into technical specs and industry trends.
SupAnchor's SupCT Bolt System offers high ductility and corrosion resistance for efficient rock support in tunneling and mining, addressing complex geological challenges with innovative self-drilling technology.
Exploring how SupAnchor's self drilling anchor system addresses complex geological challenges in infrastructure, with on-site insights and technical specs for improved geotechnical reinforcement.
SupAnchor introduces the SupShell expansion rock bolt system, offering immediate anchorage and easy installation for challenging geotechnical projects in Europe and beyond.
SupAnchor's self drilling anchor system provides critical geotechnical reinforcement in a challenging European railway tunnel, highlighting innovation and industry trends in infrastructure safety.