The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

Explore how SupAnchor's geotechnical reinforcement system addresses geological challenges in a large-scale infrastructure project, highlighting innovation and industry trends.
SupAnchor's SupShell expansion rock bolt system provides immediate anchorage and efficient installation for geotechnical projects, enhancing safety and productivity worldwide.
Exploring how SupAnchor's self-drilling anchor bolts are revolutionizing foundation support in complex infrastructure projects across Europe and America, enhancing geotechnical reinforcement systems.
SupAnchor launches its GFRP Solid Bolt, featuring high tensile strength, corrosion resistance, and lightweight properties for durable geotechnical engineering applications worldwide.
A recent European tunneling project showcases how SupAnchor's self drilling anchor system provides robust foundation support, addressing geotechnical challenges and highlighting industry advancements.