The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's self drilling anchor system proved its technical value in a complex geotechnical project, combining rapid installation with high load capacity for foundation and slope stabilization.
SupAnchor introduces SupFRP GFRP Mesh, a corrosion-resistant, non-conductive grid for roofs, walls, flat slabs, and highway overlays. Lightweight and high-strength.
SupAnchor's Grade 75 self-drilling hollow anchor bars deliver ASTM A615-compliant performance for hydropower slope stabilization, combining high bond strength, system compatibility, and rapid installation.
A major European infrastructure project overcame difficult ground conditions using SupAnchor self drilling anchor bolts, highlighting the value of advanced geotechnical reinforcement systems in modern tunneling and slope stabilization.
SupAnchor's self drilling anchor system integrates drilling, grouting, and anchoring in one, delivering high tensile strength and corrosion resistance for demanding geotechnical projects.