The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's self drilling anchor systems provide critical ground stabilization in a challenging hydropower project, highlighting innovation in geotechnical engineering for infrastructure development.
SupAnchor launches the SupCT Bolt System, a self drilling anchor bolt with high ductility and corrosion resistance, ideal for tunneling and mining projects worldwide.
Report on SupAnchor's application of self drilling anchor bolts for slope stabilization in a major infrastructure project, highlighting technical parameters and industry relevance.
SupAnchor introduces the SupShell expansion rock bolt system, featuring immediate anchorage and corrosion protection, designed to improve efficiency in mining and tunneling applications globally.
SupAnchor's self drilling anchor bolt system provides reliable geotechnical reinforcement for challenging construction sites, addressing complex geological issues in tunneling and slope stabilization.