The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's self drilling anchor system provides advanced geotechnical reinforcement for a challenging slope stabilization project, ensuring long-term safety and efficiency.
SupAnchor's GFRP dowel bars provide corrosion-free load transfer for concrete slabs, offering 100+ year service life and non-magnetic properties. Used in airport expansion, they ensure structural stability and reduce maintenance.
A major highway project in Austria uses SupAnchor self drilling anchor bolts for slope stabilization, overcoming challenging geology with high tensile strength and corrosion protection.
SupAnchor introduces GFRP rebar with tensile strength up to 1000 MPa, non-corrosive, non-magnetic, and lightweight. Ideal for bridges, seawalls, and soft-eye excavation.
SupAnchor's self drilling anchor system provides ground stabilization for a challenging slope in Norway, showcasing advanced geotechnical reinforcement technology.