The under-construction La-Lin Highway of Tibet, is the main traffic artery that connects the center and the east of Tibet.
With total length of 409.2km divided into 10 sections, the highway transits from 3,750m sea level to 2,700m sea level, passing through Mount Mila with over 5,000m sea level, with high construction standard and difficulty of operation.
According to the requirement of site work, massif, strata of each section of La-Lin Highway, SupAnchor designed and manufactured R32N SDA Bar, R25 Expansion Shell Bar, FRP Bar and accessories with safer performance.
There have been over 20,000 meters of SupAnchor bars and accessories currently in the application of tunneling, slope stabilization of 7 sections of La-Lin Highway.
The following construction requires the production of bars and accessories to proceed as planned.

SupAnchor's innovative self drilling anchor bolt system provides critical support in challenging geotechnical projects, ensuring stability and safety in infrastructure development across Europe and beyond.
SupAnchor introduces GFRP dowel bars for load transfer in concrete slabs, offering 100+ years service life, high strength, and non-conductive properties for infrastructure projects.
An in-depth look at SupAnchor's self drilling anchor bolt system applied in a challenging tunneling project, highlighting technical specs and industry benefits for geotechnical reinforcement.
SupAnchor's new GFRP self drilling anchor bolt integrates drilling, grouting, and anchoring for efficient tunnel and slope stabilization, offering high strength and ISO compliance.
SupAnchor's self drilling anchor bolts provide robust ground stabilization in complex geological conditions, supporting infrastructure projects across Europe with innovative solutions.